Run the Belt
Part of the Counters and Numbers section of Coddy's PLC Programming journey. Lesson 10 of 17.
Meet the sorting conveyor, seen from above. Boxes are put on the left end and ride a belt to the right at 250 mm a second. Along the way:
Entry: a light beam near the start, TRUE while a box breaks itTall: a height sensor, TRUE only while a tall box passesPusher: an arm that shoves a box into the side binEye: a light beam near the end
Over the next lessons you will count, batch and sort the boxes. First the belt itself: Belt runs the motor, and it starts and stops like any motor, with a seal-in. Stop is wired NC, as always.
Challenge
MediumMake Start run the belt and keep it running until Stop. Light Lamp while the belt runs.
Try it yourself
{"v":1,"lang":"ld","tags":[],"rungs":[{"els":[]}]}All lessons in Counters and Numbers